Skip to content
Call or text (815) 420-3377Mon to Sat, 7 a.m. to 7 p.m.

Bathroom Remodel in Machesney Park, IL

Updated

Machesney Park in short

22.6% of the 9,118 homes in Machesney Park were built before 1960, against 35.5% county-wide; the median year built is 1978. Of 6,827 owner households, 33.6% are headed by someone 65 or older. Permits come from Machesney Park Building Division (inspections by Loves Park). National guides put a full bathroom remodel at $6,651 to $17,661 (Angi); no guide publishes a Rockford price.
8,577
households in Machesney Park
1978
median year built (county 1971)
22.6%
of homes built before 1960 (county 35.5%)
33.6%
of owners are 65 or older (county 34.7%)

The local numbers

How old the homes are in Machesney Park

Housing age in Machesney Park is close to the Winnebago County norm. The median home was built in 1978 (county: 1971); 22.6% of its 9,118 homes predate 1960 and 18.2% went up in 2000 or later. Bathrooms from the 1970s and 1980s are usually due for a new shower or vanity by now even when the layout still works.

Before 1980 is when 54.4% of the homes in Machesney Park went up, against 63.4% county-wide. The EPA's cutoff is 1978, so most of those houses fall under its lead-safe work rule: anyone paid to tear out a painted wall or window in them must be certified. Ask for the certificate before demolition starts.

Owners head 79.6% of households in Machesney Park, and the householder is 65 or older in 33.6% of those 6,827 owned homes. Even below the county share, that is a lot of households weighing a low-curb shower or grab bars; the accessible bathroom page covers the prices, and Illinois gives buyers 65 and older 15 business days to cancel a contract signed at home with an uninvited salesperson.

Permits in Machesney Park are handled locally. The Village lists residential additions and alterations, and any plumbing, HVAC or electrical work, as needing a building permit. Same-size window replacement, cabinets, countertops, carpeting and flooring do not.

Plumbing work needs a permit. State law lets the owner-occupant of a single-family home be issued one, and the village code's definition of an electrical contractor leaves out homeowners doing their own work in their own home.

Water in Machesney Park: The North Park Public Water District serves Machesney Park from groundwater wells (about 35,580 people across Machesney Park, Roscoe and Loves Park). Its report lists sodium at up to 78.8 ppm with the note "Used in water softener regeneration" but does not publish hardness. Our hard water guide covers what that means for a new shower.

Loves Park inspects Machesney Park work, so once the Village issues the permit, inspections are scheduled through the Loves Park Building Department at (815) 654-5033.

Homes by year built: Machesney Park vs Winnebago County2000 or later: Machesney Park 18.2%, Winnebago County 13.6%; 1980 to 1999: Machesney Park 27.4%, Winnebago County 23%; 1960 to 1979: Machesney Park 31.8%, Winnebago County 27.9%; 1940 to 1959: Machesney Park 19.6%, Winnebago County 20%; 1939 or earlier: Machesney Park 3%, Winnebago County 15.5%Machesney ParkWinnebago CountyBuilt 2000 or later18.2%13.6%Built 1980 to 199927.4%23%Built 1960 to 197931.8%27.9%Built 1940 to 195919.6%20%Built 1939 or earlier3%15.5%
Share of housing units by the year built. Source: U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034.

Machesney Park housing and households vs Winnebago County

MeasureMachesney ParkWinnebago County
Residents22,630283,292
Housing units9,118125,002
Occupied (households)8,577116,014
Owner-occupied households6,827 (79.6%)76,408 (65.9%)
Owners aged 65 or older2,292 (33.6% of owners)26,511 (34.7% of owners)
Renter households1,750 (20.4%)39,606 (34.1%)
Median year built19781971
Built before 19403%15.5%
Built before 196022.6%35.5%
Built before 198054.4%63.4%
Built 2000 or later18.2%13.6%
Single-family detached87.7%70.4%
Mobile homes0.5%1.3%
Moved in 1989 or earlier14.7%10.9%

Source: U.S. Census Bureau, ACS 2024 5-year (2020-2024), tables B01003, B25003, B25007 (tenure by age of householder), B25024, B25034, B25035 and B25038.

Local rules

Permits, plumbing and water in Machesney Park

Bathroom work and permits
The Village lists residential additions and alterations, and any plumbing, HVAC or electrical work, as needing a building permit. Same-size window replacement, cabinets, countertops, carpeting and flooring do not. The page does not say whether a like-for-like fixture swap needs a plumbing permit, so ask when you apply. source 1 source 2
Permit office
The Village Building Division, 300 Roosevelt Road, (815) 877-6072, lists "Residential additions and alterations" and any plumbing, HVAC or electrical work as needing a building permit, and takes residential applications online through Citizenserve. Siding and same-size window replacement, kitchen cabinets and countertops, and carpeting and flooring do not need one. Building inspections are performed by the City of Loves Park through a cooperative agreement, and the village gives instructions when the permit is issued; Loves Park's number is (815) 654-5033. source 1 source 2
Who may do the plumbing
Plumbing work needs a permit. State law lets the owner-occupant of a single-family home be issued one, and the village code's definition of an electrical contractor leaves out homeowners doing their own work in their own home. source 1 source 2
Permit fees
Fees are set by village board resolution, and the permit page says costs are "determined by the Building Clerk," so no remodel formula is published. Starting before a permit doubles the fee, to not less than $250. source
Code edition
Ordinance 10-25, passed May 5, 2025, adopts the 2021 International Building Code, the 2020 NFPA 70 National Electrical Code, the 2021 International Mechanical Code and the International Residential Code for One- and Two-Family Dwellings, 2021 edition. The village page says the 2024 IECC with Illinois amendments became effective November 30, 2025. We found no local amendment text. source 1 source 2
Contractor rules
We found no village general contractor registration. The permit page asks for license information when a contractor does the job (stated for roofing), and village code defines an electrical contractor as not including "homeowners who do their own work in their own home." source 1 source 2
Water supplier
The North Park Public Water District serves Machesney Park from groundwater wells (about 35,580 people across Machesney Park, Roscoe and Loves Park). Its report lists sodium at up to 78.8 ppm with the note "Used in water softener regeneration" but does not publish hardness. source
Also worth knowing
Loves Park inspects Machesney Park work, so once the Village issues the permit, inspections are scheduled through the Loves Park Building Department at (815) 654-5033. source 1 source 2

About Machesney Park. Machesney Park is a village in Winnebago County with 22,950 residents at the 2020 census. Wikipedia

ZIP codes. 61115 (82% of its land), 61073 (9% of its land), 61011 (7% of its land), 61103 (2% of its land), 61111 (1% of its land). Census 2020

Full pricing, the complete service menu, and the rest of the service area are on the bathroom remodel in Rockford, IL homepage.

Common questions

Machesney Park bathroom remodel questions

Do I need a permit to remodel a bathroom in Machesney Park?

The Village lists residential additions and alterations, and any plumbing, HVAC or electrical work, as needing a building permit. Same-size window replacement, cabinets, countertops, carpeting and flooring do not. The page does not say whether a like-for-like fixture swap needs a plumbing permit, so ask when you apply.

Can I do my own bathroom plumbing in Machesney Park?

Plumbing work needs a permit. State law lets the owner-occupant of a single-family home be issued one, and the village code's definition of an electrical contractor leaves out homeowners doing their own work in their own home.

What does a bathroom permit cost in Machesney Park?

Fees are set by village board resolution, and the permit page says costs are "determined by the Building Clerk," so no remodel formula is published. Starting before a permit doubles the fee, to not less than $250. Fee schedules are undated or years old, so confirm the figure before you budget. National guides put permits at $100 to $1,000 (Angi); the cost page shows the rest.

Who supplies the water in Machesney Park?

The North Park Public Water District serves Machesney Park from groundwater wells (about 35,580 people across Machesney Park, Roscoe and Loves Park). Its report lists sodium at up to 78.8 ppm with the note "Used in water softener regeneration" but does not publish hardness.

How old are the bathrooms in Machesney Park?

The Census does not count bathrooms, but it does date the homes. Per the ACS 2020-2024 5-year estimates, the median home in Machesney Park was built in 1978 (Winnebago County: 1971). 22.6% of its 9,118 homes were built before 1960 and 54.4% before 1980, against 63.4% county-wide.

What does a bathroom remodel cost in Machesney Park?

No cost guide publishes a figure for Machesney Park. Angi's national guide puts a full bathroom remodel at $6,651 to $17,661 with an average of $12,155, and a tub-to-shower conversion at $1,200 to $15,000. The nearest local number is the 2025 Cost vs. Value report for Chicago, which prices a midrange bath remodel at $24,072. The full price table shows each source and its date.

How many homeowners in Machesney Park are 65 or older?

Per the ACS 2020-2024 5-year estimates, 2,292 of Machesney Park's 6,827 owner households (33.6%) are headed by someone 65 or older, against 34.7% for Winnebago County. For grab bars, a low-curb shower or a comfort-height toilet, see accessible bathrooms.

Do bathroom remodelers have to be licensed in Machesney Park?

We found no village general contractor registration. The permit page asks for license information when a contractor does the job (stated for roofing), and village code defines an electrical contractor as not including "homeowners who do their own work in their own home.". Illinois does not license remodelers at the state level; plumbers are state licensed, and every remodeler must carry the insurance the Home Repair and Remodeling Act requires.

Planning a bathroom in Machesney Park?

Tell us the address, which bathroom and what you want changed. We reply with a price before any work is scheduled.